Hydropower · Under construction
HEC Grabova 1
Construction works at the Grabova 1 hydropower plant. Under construction.
The project
Overview
The project is under construction. The photo shows the concrete works on site: wall formwork and concrete delivery.
To be completed by the company: installed capacity, head, flow, river, investor and the works carried out by DINA POWER.
Planning a hydropower plant?
Send us the study, the location or just the idea. We reply with a works plan and a timeline.