Hydropower · Under construction

HEC Grabova 1

Construction works at the Grabova 1 hydropower plant. Under construction.

Type
Hydropower
Stage
Under construction
Year
2026
Location
—
River
—
Turbines
—
Investor
—
Our role
—
The project

Overview

The project is under construction. The photo shows the concrete works on site: wall formwork and concrete delivery.

To be completed by the company: installed capacity, head, flow, river, investor and the works carried out by DINA POWER.

Planning a hydropower plant?

Send us the study, the location or just the idea. We reply with a works plan and a timeline.

Request a quote
This page has not been translated into English yet. It is shown in the original language.