Hydropower construction · Tirana, since 2019
From the river to the turbine, we build it.
A 100% Albanian-owned construction company. We build the civil works of hydropower plants, from the water intake to the powerhouse, as well as residential and industrial buildings.
Six phases of works, one team.
The civil works of a diversion hydropower plant, in the order they happen on site.
River diversion and intake
We temporarily divert the river and build the weir, the gates and the desilting basin, so the water enters the system clean.
Headrace channel and tunnel
Concrete channels, pipes and galleries that carry the water on a gentle slope, without losses, to the forebay.
Forebay
A concrete basin that calms the water before the drop, with trash racks, a spillway and the penstock inlet.
Penstock
Slope excavation, the pipe bedding, anchor blocks and supports.
Powerhouse
The turbine foundations, the building structure and the concrete around the units.
Tailrace, roads and grid link
The tailrace back to the river, service roads, the substation platform and electrical installations.
HEC Grabova 1
Concrete works on the HEC Grabova 1 site: wall formwork and on-site concrete delivery. The project is under construction.
- Stage: under construction
- Year: 2026
How much energy does a plant produce?
Move the flow and the head: the power comes from the same formula used in every feasibility study.
P = ρ · g · Q · H · η
Rough estimate: 45% capacity factor and 2,500 kWh per home per year. For a real project the figures come from the hydrological study.
We also build housing and industry.
Hydropower plants
Civil structures, foundations and supporting infrastructure for hydropower plants, to technical and environmental standards.
Residential buildings
From single houses to residential complexes: we oversee every phase, with quality workmanship and to current codes.
Industrial buildings
Factories, warehouses and production halls, built for structural strength, workplace safety and long-term use.
Four principles on every site.
Quality
We build to the highest engineering standards.
Integrity
Transparency and trust guide every project.
Innovation
Modern solutions for complex challenges.
Reliability
We deliver safely, efficiently and on time.
Company details
- Name
- DINA POWER shpk
- NIPT
- L91315047G
- Founded
- 15 January 2019
- Ownership
- 100% Albanian
- Administrator
- Olsi Karasani
- Head office
- Tirana
Let's talk about your project.
For partnerships, quote requests or any other information. We reply within one working day.
- [email protected]
- Mikel Maruni St., Tirana 1054, Albania
- Monday – Friday: 09:00 – 17:00
Planning a hydropower plant?
Send us the study, the location or just the idea. We reply with a works plan and a timeline.